Darba platformas puspiekabeFAYMONVILLE
MAX Trailer MAX200 Sattelanhänger Megatrailer
Darba platformas puspiekabe
FAYMONVILLE
MAX Trailer MAX200 Sattelanhänger Megatrailer
Stāvoklis
Jauns
Atrašanās vieta
Essen 

Rādīt attēlus
Rādīt karti
Pamatdati
Cena un atrašanās vieta
- Pārdevēja atrašanās vieta:
- Heegstraße 6-8, 45356 Essen, Vācija

Zvanīt
Tehniskā informācija
- Maksimālā kravnesība:
- 36 245 kg
- Kopējais svars:
- 45 000 kg
- Asu konfigurācija:
- 3 asis
- Krautuves garums:
- 13 500 mm
- Kopējais platums:
- 2 540 mm
- Aprīkojums:
- ABS
Piedāvājuma informācija
- Sludinājuma ID:
- A215-39-968
- Atsauces numurs:
- 36796
- Atjaunināšana:
- pēdējo reizi 20.03.2026
Apraksts
You can find our complete inventory of immediately and short-term available vehicles on our website.
Excerpt from the equipment list. Full equipment details available upon request.
Load area:
* Load platform made of hardwood flooring with rear chamfer approx. 1,000 mm x 8°
* 2 pairs of lashing rings (LC 5,000 daN)
* 1 pair of lashing rings (LC 10,000 daN)
* 6 pairs of outward-folding lashing rings (LC 5,000 daN)
* 2 pairs of outward-folding lashing rings (LC 10,000 daN)
* Recesses in the outer frame of the load area for attaching tension straps (LC 2,000 daN)
Itodpfxsyvnfae Ahxjd
Landing legs:
* JOST mechanical landing legs with 2-speed gearbox for approx. 24 t lifting capacity (approx. 50 t test load)
Axles:
* BPW axles, air suspension, disc brakes (approx. 377 mm), lifting/lowering function (ET 120)
* Axle tools
Tires:
* Tires 435/50 R 19.5 – make at our discretion
* TPMS tire pressure monitoring system according to ECE R 141. Data transfer to the tractor unit is via the standardized EBS interface according to ISO 11992. The tractor unit must be capable of receiving and displaying this data for correct operation
Braking system:
* Wabco braking system compliant with EU regulations with EBS-E (2S2M) without connecting lines to the tractor unit
Steel construction:
* Steel construction made from high-strength fine-grained steels, steel grades: S355J2+N/S355MC (yield strength 355 MPa), S690QL/S700MC (yield strength 690 MPa)
Electrical system:
* Electrical system in accordance with EU regulations, lighting 24 volt ASPÖCK-NORDIK (ASS3)
* All LED side marker lamps flash with the indicators
* ASPÖCK-UNIBOX at the front connection strip with sockets 24N, 24S & 15-pin. Connections as per ISO. 24N ISO-1185, 24S ISO-3731, 15-pin ISO-12098
Painting:
* Complete steel structure shot-blasted after welding with automated shot blast system, secondary blasting with corundum for optimal coating adhesion
* HRM metalizing of the entire chassis with ZINACOR 850 (85% zinc / 15% aluminum) for optimum corrosion protection
* Final coating with two layers of 2K topcoat, solid in RAL 3002 Carmine Red in accordance with the RAL System 841GL
* Rear section metalized and painted RAL 9010 (Pure White)
* Paint finish tested to ISO 9227-NSS salt spray standard
* Cavity sealing with special wax
Including the following additional equipment:
* Yellow-red air couplings on the galvanized front connection strip
* 4 wheel chocks with holders
* 2-inch kingpin
* Load platform with heavy-duty hardwood floor
* 1 spare wheel holder under the platform on the right-hand side in the direction of travel
* Galvanized folding supports under the chamfer of the load area
* 9 pairs of stake pockets for plug-in stakes, approx. 100 x 50 mm, in the outer frame of the loading platform
* One galvanized steel front wall (EN12642-XL), approx. 1,600 mm high
* Anti-slip sand coating painted onto the central beam
* 1 INOX crosswise tool box under the deck, approx. 1,000 x 400 x 2,500 mm
* 6 pairs of WADER container sockets in the platform, for 1x 20' container, 2x 20' containers or 1x 40' container
* 3 pairs of transverse stake pocket rails mounted in the load area, for plug-in stakes approx. 100 x 50 mm
* Storage for up to 9 pairs of plug-in stakes approx. 100 x 50 mm, bolted inside the front wall
* 2 INOX toolboxes under the platform, left and right, approx. 600 x 350 x 600 mm
* Holder for aluminum ramps, crosswise under the platform, behind the axles
* 1 beacon supplied loose
* 2 pairs of ferry rings under t
Sludinājums tika automātiski tulkots. Iespējamas tulkošanas kļūdas.
Excerpt from the equipment list. Full equipment details available upon request.
Load area:
* Load platform made of hardwood flooring with rear chamfer approx. 1,000 mm x 8°
* 2 pairs of lashing rings (LC 5,000 daN)
* 1 pair of lashing rings (LC 10,000 daN)
* 6 pairs of outward-folding lashing rings (LC 5,000 daN)
* 2 pairs of outward-folding lashing rings (LC 10,000 daN)
* Recesses in the outer frame of the load area for attaching tension straps (LC 2,000 daN)
Itodpfxsyvnfae Ahxjd
Landing legs:
* JOST mechanical landing legs with 2-speed gearbox for approx. 24 t lifting capacity (approx. 50 t test load)
Axles:
* BPW axles, air suspension, disc brakes (approx. 377 mm), lifting/lowering function (ET 120)
* Axle tools
Tires:
* Tires 435/50 R 19.5 – make at our discretion
* TPMS tire pressure monitoring system according to ECE R 141. Data transfer to the tractor unit is via the standardized EBS interface according to ISO 11992. The tractor unit must be capable of receiving and displaying this data for correct operation
Braking system:
* Wabco braking system compliant with EU regulations with EBS-E (2S2M) without connecting lines to the tractor unit
Steel construction:
* Steel construction made from high-strength fine-grained steels, steel grades: S355J2+N/S355MC (yield strength 355 MPa), S690QL/S700MC (yield strength 690 MPa)
Electrical system:
* Electrical system in accordance with EU regulations, lighting 24 volt ASPÖCK-NORDIK (ASS3)
* All LED side marker lamps flash with the indicators
* ASPÖCK-UNIBOX at the front connection strip with sockets 24N, 24S & 15-pin. Connections as per ISO. 24N ISO-1185, 24S ISO-3731, 15-pin ISO-12098
Painting:
* Complete steel structure shot-blasted after welding with automated shot blast system, secondary blasting with corundum for optimal coating adhesion
* HRM metalizing of the entire chassis with ZINACOR 850 (85% zinc / 15% aluminum) for optimum corrosion protection
* Final coating with two layers of 2K topcoat, solid in RAL 3002 Carmine Red in accordance with the RAL System 841GL
* Rear section metalized and painted RAL 9010 (Pure White)
* Paint finish tested to ISO 9227-NSS salt spray standard
* Cavity sealing with special wax
Including the following additional equipment:
* Yellow-red air couplings on the galvanized front connection strip
* 4 wheel chocks with holders
* 2-inch kingpin
* Load platform with heavy-duty hardwood floor
* 1 spare wheel holder under the platform on the right-hand side in the direction of travel
* Galvanized folding supports under the chamfer of the load area
* 9 pairs of stake pockets for plug-in stakes, approx. 100 x 50 mm, in the outer frame of the loading platform
* One galvanized steel front wall (EN12642-XL), approx. 1,600 mm high
* Anti-slip sand coating painted onto the central beam
* 1 INOX crosswise tool box under the deck, approx. 1,000 x 400 x 2,500 mm
* 6 pairs of WADER container sockets in the platform, for 1x 20' container, 2x 20' containers or 1x 40' container
* 3 pairs of transverse stake pocket rails mounted in the load area, for plug-in stakes approx. 100 x 50 mm
* Storage for up to 9 pairs of plug-in stakes approx. 100 x 50 mm, bolted inside the front wall
* 2 INOX toolboxes under the platform, left and right, approx. 600 x 350 x 600 mm
* Holder for aluminum ramps, crosswise under the platform, behind the axles
* 1 beacon supplied loose
* 2 pairs of ferry rings under t
Sludinājums tika automātiski tulkots. Iespējamas tulkošanas kļūdas.
Piegādātājs
Piezīme: Reģistrējieties bez maksas vai piesakieties, lai iegūtu visu informāciju.
Reģistrēts kopš: 2003
77 Sludinājumi tiešsaistē
Nosūtīt pieprasījumu
Tālrunis & Fakss
+49 201 8... sludinājumi
Jūsu sludinājums ir veiksmīgi dzēsts
Radās kļūda


















